Saturday, November 2, 2013

Floor!

Today I spent about three hours laying down the subfloor on the addition. I also took down the railing, so things took a very dramatic visual turn after the work was done. The plywood was glued with liquid nails (to avoid creaks/squeaks) and nailed with my big macho pneumatic nailer. Jonah was a helpful cheerleader throughout.